Fuel outage inspections at Ringhals Nuclear Power Plant

sala 172, bud. 39 (Cyfronet, III piętro) / https://www.gotomeet.me/NCBJmeetings/uz3-and-phd4gen-seminars

20 Feb, 2024 - 20 Feb, 2024

Seria: Seminarium Zakładu Energetyki Jądrowej i Analiz Środowiska (UZ3)

Prelegent i afiliacja: Jessica Lybark, Antun Hroh Vattenfall

Data: 20.02.2024, godz. 11:30

Miejsce: sala 172, bud. 39 (Cyfronet, III piętro) / https://www.gotomeet.me/NCBJmeetings/uz3-and-phd4gen-seminars

Streszczenie: 

 

Each outage the fuel and core department at the Ringhals need to verify that each fuel element is operational for the next intended cycle. This include visual inspection, fuel assembly bow and length measurement, visual inspection of the top and bottom nozzles. If we had any fuel updates or changes introduced it could also implicate new inspection or extended inspection of some sort.